The Geiranger Wastewater Treatment Plant (WWTP) is located in Norway’s Stranda municipality, which for many years has been a popular tourist destination. Geiranger is visited by 160 cruise ships every summer making it the second largest cruise ship port in Norway.
The Challenge
On a typical day, the WWTP treats the wastewater for 300 permanent residents. However, in the summer months, treatment capacity must increase substantially to account for a large influx of over 7000 tourists per day.
Treated wastewater is discharged to the Fjord of Geiranger, which is a UNESCO world heritage site. This requires them to meet removal rates of at least 50% TSS and 20% BOD stipulated by the European wastewater directive for less sensitive recipients.

The Solution
The Geiranger WWTP installed two SF2000 Salsnes Filters that remove 55-70% TSS from the wastewater. Each filter has a 350 micron filtermesh and integrated sludge dewatering. The way in which the Salsnes Filter system is designed allows it to handle the significant variations in incoming flow that the Plant experiences.
A Control Power Panel that houses a Programmable Logic Controller (PLC) automates system operation. A sensor tells the unit when, and at what speed, to start rotating the filtermesh based on the amount of incoming wastewater. The PLC will then simultaneously start the Air Knife filtermesh cleaning system and the sludge dewatering unit.

Quick Facts
Location
Stranda, Norway
Application
Municipal – Primary Treatment
P.E.
2,000
Permanent Residents
300
Summer Tourists
7,000+ per day
Filter Model
Salsnes Filter SF2000
Quantity
2 units
Filter Mesh
350 micron
Influent TSS
100 – 400 mg/L
Effluent TSS
45 – 120 mg/L
Max Flow Rate
40 L/s (0.9 MGD)
Dewatered Sludge
25% Total Solids
Do you want to know more? Get in touch!