Home / Case studies / Optimizing Biogas Production with Primary Sludge

Optimizing Biogas Production with Primary Sludge

Saulekilen Wastewater Treatment Plant, Arendal, Norway

  • TSS removal

    60%

  • Treatment Capacity

    13.4 MGD

  • Filter model

    SFK600C

  • P.E.

    80,000

Project Background

The Saulekilen Wastewater Treatment Plant, located in the town of Arendal, in Southern Norway, treats a typical municipal mix of wastewater from households and small to medium-sized industry. The Plant was looking to upgrade their facility to almost double treatment capacity from 45,000 p.e. to 80,000 p.e. In order to be considered for the upgrade, potential equipment needed to be:

  • Easy-to-operate
  • Compact, to fit inside the existing building
  • Capable of optimizing sludge production to generate more biogas
  • Cost-effective compared to alternatives
  • A proven, reliable technology
SFK600 Salsnes Filter units installed at the Saulekilen WWTP.
Salsnes Filter SFK600C

“The methane we produce is used for internal energy production, reducing such costs and contributing to a smaller carbon footprint.”

– Knut Berg-Larsen, Technical Director of Arendal Municipality, Norway

Results of the Upgrade

More Available Phosphorous

There is another benefit of chemical-free Salsnes Filter sludge over conventional secondary sludge. According to Berg-Larsen, because there are no chemicals (i.e. flocculants) in the sludge, it offers a higher nutritional value for plants when used as a fertilizer for agriculture. Flocculants have a negative impact on crops, as they can inhibit phosphorous release thereby reducing its availability to crops.

Phosphorous is a limited global resource, steadily increasing in price, so primary Salsnes Filter sludge can command a high market value. “It has been simple to find a market for this sludge” says Berg-Larsen.

“With this design, we built the treatment plant NOK 17 million cheaper than with a traditional layout.”

The Salsnes Filter system is installed on top of biological filters, fitting inside existing buildings.

It’s estimated that this compact layout has reduced overall investment costs by NOK 17 million (~ $2 million USD). This amounts to an upgrade that has cost approximately half that of a conventional
treatment plant.

“Even if we were to build a new plant, we would have chosen this process. The alternatives that we know of would come out more costly, and this also goes for operational costs.”

– Knut Berg-Larsen, Technical Director of Arendal Municipality, Norway

Quick Facts

  • Location

    Arendal, Norway

  • Application

    Municipal – Primary Treatment & Biogas

  • P.E.

    80,000

  • Filter Model

    Salsnes Filter SFK600

  • Quantity

    6 units

  • Influent TSS

    234 mg/L

  • Effluent TSS

    95 mg/L

  • Max Flow Rate

    589 L/s (13.4 MGD)

  • Dewatered Sludge

    25% Total Solids

  • Cost Savings

    ~NOK 17M (~$2M USD)

Do you want to know more? Get in touch!

Tor-Olav-Lyng

Tor Olav Lyng

Director Technology

Petter-Kjolseth

Petter Kjølseth

Sales Manager

View other case studies

Municipal

Recovering Lost Treatment Capacity

Faced with rising loads, aging infrastructure and limited space, Daphne Utilities rethought primary treatment to boost capacity, stabilize downstream processes and reduce operational strain—all within...

Municipal

Primary Treatment & Cellulose Recovery

By integrating advanced primary treatment, the Carbonera WRRF increased solids capture and recovered high‑value cellulose, improving plant performance while supporting a circular, resource‑driven approach to...